To edit, add comments or upload photos: Sign In
Area sosta camper Vico di Cianocharging location
Nearest Address:
S.p.54
Italy
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
(Unknown)
Usage Cost:
Free
Operational Status:
Operational
Latitude:
44.600037962912594
Longitude:
10.415125510915505
OCM Ref: OCM-91554
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Unknown Usage Type
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CEE 3 Pin
Unknown
OCM-CN-129776
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ] Comment by ForumElettrico.it 08/09/2017 07:02:35
Other Charging Locations
There are 9 matching results
Enel Ricci Casa Ciano d'Enza
1
5
0.27 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Castello di Rossena
1
1
1.44 Miles
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
San Polo d'Enza Borghi | EnelX
2
6
1.89 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SAN POLO D'ENZA Rampognana | ENELX
2
6
2.39 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Project Group
1
5
2.49 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Parco Bazzano Costa Pieve
1
1
2.95 Miles
(Unknown)
Operational
(Unknown)
Operational
Prese Comune 3,7kW
3.07 Miles
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Unknown
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Unknown
Be Charge Fanfulla
1
5
3.1 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Conad
1
7
3.47 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2017-08-09