SAN POLO D'ENZA Rampognana | ENELXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok con NFC Enel X sulla presa di sinistra. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post254584.html#p254584
https://www.forumelettrico.it/forum/post254584.html#p254584 Comment by ForumElettrico.it 11/14/2021 16:21:49
[ General Comment , Charged Successfully ]Accanto abbiamo anche un forno, un tabacchino e dall'altra parte della rotonda un bar. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-sigma-san-polo-d-enza-re-via-rampognana-4-t12311.html
https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-sigma-san-polo-d-enza-re-via-rampognana-4-t12311.html Comment by ForumElettrico.it 08/27/2020 16:45:18
Other Charging Locations
There are 9 matching results
Project Group
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
San Polo d'Enza Borghi | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel Ricci Casa Ciano d'Enza
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Area sosta camper Vico di Ciano
1
1
(Unknown)
Operational
Prese Comune 3,7kW
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Unknown
Enel X Conad
1
7
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Fanfulla
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
DriWe Famila
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Conad
2
8
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-11-14
Uploaded by ForumElettrico.it on 2020-08-27
Uploaded by ForumElettrico.it on 2020-08-27
Uploaded by ForumElettrico.it on 2020-08-27
Uploaded by ForumElettrico.it on 2020-08-27
Uploaded by ForumElettrico.it on 2020-08-27