Hera Ciro Menotti | EnelX by Heracharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]La colonnina credo sia stata cambiata, visto che è diversa la livrea ed in più la tipo 3A è stata sostituita dalla tipo 2. Siamo sulla circonvallazione ed appena fuori dal centro storico, per cui si trova di tutto per passare il tempo della ricarica. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post179410.html#p179410
https://www.forumelettrico.it/forum/post179410.html#p179410 Comment by ForumElettrico.it 02/20/2021 15:55:27
[ General Comment , Did Not Visit Location ] https://www.forumelettrico.it/forum/colonnina-inrete-distribuzione-energia-spa-22kw-modena-mo-viale-ciro-menotti-148-t2454.html Comment by ForumElettrico.it 03/20/2018 18:33:58
[ General Comment , Charged Successfully ]https://www.forumelettrico.it/forum/colonnina-inrete-distribuzione-energia-spa-22kw-modena-mo-viale-ciro-menotti-148-t2454.html
Comment by ForumElettrico.it 03/20/2018 18:33:46
Other Charging Locations
There are 9 matching results
Hera
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
MODENA Emilia Est | ENELX BY HERA
2
9
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnerMia Martiri della Libertà
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
MODENA Fabrizi | ENELX BY HERA
2
7
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Museo Enzo Ferrari
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Canalgrande
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Best Western Premier Milano Palace Hotel
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
EnerMia
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-02-20
Uploaded by ForumElettrico.it on 2021-02-20
Uploaded by ForumElettrico.it on 2021-02-20
Uploaded by ForumElettrico.it on 2021-02-20
Uploaded by ForumElettrico.it on 2018-03-20
Uploaded by ForumElettrico.it on 2018-03-20
Uploaded by ForumElettrico.it on 2018-03-20
Uploaded by ForumElettrico.it on 2018-03-20