Hera charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Siamo a due passi dal centro storico e "credo" appena fuori dalla ZTL, per cui si trova di tutto per passare il tempo della ricarica. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-hera-22-kw-modena-mo-via-san-giovanni-del-cantone-34-t17839.html
https://www.forumelettrico.it/forum/colonnina-hera-22-kw-modena-mo-via-san-giovanni-del-cantone-34-t17839.html Comment by ForumElettrico.it 05/15/2021 15:12:13
Other Charging Locations
There are 9 matching results
Best Western Hotel Liberta'
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Modena San Domenico | EnelX by Hera
4
10
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnerMia Martiri della Libertà
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Canalgrande
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Ciro Menotti | EnelX by Hera
3
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnerMia
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Best Western Premier Milano Palace Hotel
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
MODENA Fabrizi | ENELX BY HERA
2
7
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-05-15
Uploaded by ForumElettrico.it on 2021-05-15
Uploaded by ForumElettrico.it on 2021-05-15
Uploaded by ForumElettrico.it on 2021-05-15
Uploaded by ForumElettrico.it on 2021-05-15