Enel X IKEAcharging location
Utilizzabile con tessera Eneldrive messa a disposizione gratuitamente al punto informazioni dello store. Accessibile solo durante gli orari di apertura dello store.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Tangenziale Ovest - Uscita 5 Vigevano Milano Lorenteggio
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Hanno installato una nuova fast e sostituito le due quick cotte. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-enel-x-fast-ikea-corsico-mi-nuova-via-marchesi-4-t20165.html
https://www.forumelettrico.it/forum/colonnine-enel-x-fast-ikea-corsico-mi-nuova-via-marchesi-4-t20165.html Comment by ForumElettrico.it 10/05/2021 04:59:38
Other Charging Locations
There are 9 matching results
Ewiva Ricci Casa
1
7
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ionity Trezzano
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnelX EVAD Sede Enel Corsico
2
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Roadhouse
2
8
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Eni
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Emotion AdS Muggiano Ovest
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Atlante AdS Muggiano Ovest
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Centro Commerciale La Torre - distributore IP
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Coop Gozzoli
3
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-10-05
Uploaded by ForumElettrico.it on 2021-10-05
Uploaded by ForumElettrico.it on 2021-10-05