Ewiva Coop Gozzolicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Ewiva (IT) https://ewiva.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CCS (Type 2)
Add your own comment/check-in for this location:
Sign InRating: 5 out of 5 [ General Comment , Charged Successfully ] Comment by Protoss 03/31/2022 20:35:02
[ Important Notice (For Other Users) , Failed to Charge (Equipment Not Fully Installed) ]For moment NOT Fully Installed
Comment by Protoss 03/29/2022 08:02:34
[ General Comment , Equipment & Location Confirmed Correct ]Due colonnine con cavi CCS Combo 2 da 150 kW ed una con cavi da 300 kW. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-enel-x-high-power-coop-milano-baggio-mi-via-benozzo-gozzoli-130-t21569.html
https://www.forumelettrico.it/forum/colonnine-enel-x-high-power-coop-milano-baggio-mi-via-benozzo-gozzoli-130-t21569.html Comment by ForumElettrico.it 02/28/2022 06:53:31
Other Charging Locations
There are 9 matching results
Centro Commerciale La Torre - distributore IP
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LIDL Milano Forze Armate
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A Isola Digitale Bisceglie
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
Atlante AdS Muggiano Ovest
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Emotion AdS Muggiano Ovest
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lidl Milano Lorenteggio
2
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge Milano Lorenteggio
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVAD Sede Enel Corsico
2
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Eni
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by Protoss on 2022-03-31
Uploaded by Protoss on 2022-03-31
Uploaded by Protoss on 2022-03-31
Uploaded by ForumElettrico.it on 2022-02-28
Uploaded by ForumElettrico.it on 2022-02-28
Uploaded by ForumElettrico.it on 2022-02-28