To edit, add comments or upload photos: Sign In
ایستگاه شارژ عاملیت بهمن موتور کریمی کد 1427charging location
Nearest Address:
مشیر الدوله شرقی
منطقه ۱۲
شهرک صنعتی امیرکبیر
استان اصفهان
81951-57767
Iran, Islamic Republic Of
+982130600
Number Of Stations/Bays:
1
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
32.751191892370386
Longitude:
51.60265264739314
OCM Ref: OCM-478218
Network/Operator
مپنا - empana (IR) https://www.emapna.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
GB-T DC - GB/T 20234.3
Operational
1 Present
OCM-CN-803036
30 kW
DC
500 V
100 A
CCS (Type 2)
Operational
1 Present
OCM-CN-803037
30 kW
DC
500 V
100 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
ایستگاه شارژ باغ فدک
5.01 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ پارکینگ چمران
5.85 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ چمران
5.92 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینک هفتم محرم
6.48 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ اردیبهشت
7.09 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ اردیبهشت
7.1 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ فرهان (بوستان مهر)
7.36 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ پارکینگ جهان نما
7.47 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ حکیم
7.5 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Upload your own photos for this location: Sign In