To edit, add comments or upload photos: Sign In
ایستگاه شارژ فرهان (بوستان مهر)charging location
Nearest Address:
کندرو آتشگاه
اصفهان
استان اصفهان
84168-54151
Iran, Islamic Republic Of
+982130600
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
32.647424330868574
Longitude:
51.57394529409237
OCM Ref: OCM-478215
Network/Operator
مپنا - empana (IR) https://www.emapna.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
GB-T DC - GB/T 20234.3
Operational
2 Present
OCM-CN-803033
120 kW
DC
1000 V
125 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
ایستگاه شارژ فرهان (بوستان زمزم)
3.36 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ پارکینگ خاقانی
4.61 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینک هفتم محرم
4.67 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ اردیبهشت
4.77 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ اردیبهشت
4.77 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ جلفا
4.82 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ زیر سطحی توحید
4.98 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ طبقاتی توحید
5.07 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ هتل پارسیان کوثر
5.33 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Upload your own photos for this location: Sign In