Enel X Osteria Della Pievecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Si trova all'interno dell'area privata del ristorante, chiuso da cancello ma "forse" aperto 24/7. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-osteria-della-pieve-bologna-bo-via-quarto-di-sopra-1-8-t24985.html
https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-osteria-della-pieve-bologna-bo-via-quarto-di-sopra-1-8-t24985.html Comment by ForumElettrico.it 05/07/2022 16:00:50
Other Charging Locations
There are 9 matching results
FICO Eataly World Parcheggio Ovest | EnelX
2
9
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
FICO Eataly World Parcheggio Est | EnelX
1
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
E-Via Flex-E AdS IP
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bologna Via del Commercio Associato | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Quarto Inferiore
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Meraville
3
8
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Parco Commerciale Meraville
1
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Electra Meraville
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bologna Fonditore Taxi | EnelX
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-05-07
Uploaded by ForumElettrico.it on 2022-05-07
Uploaded by ForumElettrico.it on 2022-05-07
Uploaded by ForumElettrico.it on 2022-05-07
Uploaded by ForumElettrico.it on 2022-05-07