Bologna Via del Commercio Associato | EnelXcharging location
Posizione esatta della colonnina da verificare
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Il parcheggio è quello antistante l'Hotel ma in pochi minuti a piedi si può arrivare al Meraville. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-hotel-cosmopolitan-bologna-bo-via-del-commercio-associato-5-t17347.html
https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-hotel-cosmopolitan-bologna-bo-via-del-commercio-associato-5-t17347.html Comment by ForumElettrico.it 04/27/2021 05:40:08
Other Charging Locations
There are 9 matching results
Enel X Way Meraville
3
8
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Parco Commerciale Meraville
1
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Electra Meraville
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
FICO Eataly World Parcheggio Ovest | EnelX
2
9
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
FICO Eataly World Parcheggio Est | EnelX
1
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
E-Via Flex-E AdS IP
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera Pilastro
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Osteria Della Pieve
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Colonnina e-Distribuzione 3,7kW Trony
1
2
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-04-27
Uploaded by ForumElettrico.it on 2021-04-27
Uploaded by ForumElettrico.it on 2021-04-27
Uploaded by ForumElettrico.it on 2021-04-27
Uploaded by ForumElettrico.it on 2021-04-27