Tesla Destination Chargingcharging location
Punto Tesla Destination Charging 3 punti da 22kW
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Failed to Charge (Equipment Not Operational) ]Provato più volte in orari diversi sia i tesla che il grigio, nessuno andava, nessuno. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/san-marino-nuovo-tesla-destination-charging-a-22kw-t893.html
https://www.forumelettrico.it/forum/san-marino-nuovo-tesla-destination-charging-a-22kw-t893.html Comment by ForumElettrico.it 06/22/2020 13:58:45
Other Charging Locations
There are 9 matching results
P7 - San Marino
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
P2 - San marino
1
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
P6 - San marino
2
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro Storico - San Marino
1
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
P3 - San Marino
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
P10 - San Marino
1
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
P8 - San Marino
2
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Università
1
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Borgo Maggiore
2
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-06-22
dopo il terzo tentativo si è avviata la ricarica con la Zoe, ottimo punto da 22 kW, Ciao Cesare
Uploaded by Cesare on 2017-03-22