Punt de recàrrega Ajuntament D'ascócharging location
ENG: Charging point managed by the City of Ascó. It's a point City DUO CD332, installed by Etecnic and manufactured by Ingeteam. To use these points, we have must a RFID card. The City Council has these cards for the users. CAT: Punt de càrrega gestionat per l'Ajuntament d'Ascó. És un punt City DUO CD332, instal·lat per ETECNIC i del fabricant Ingeteam. Per poder utilitzar aquests punts, cal disposar d'una targeta RFID. L'Ajuntament disposa d'aquestes targetes per als usuaris. ESP: Punto de carga gestionado por el Ayuntamiento de Ascó. Es un punto City DUO CD332, instalado por ETECNIC y del fabricante INGETEAM. Para poder utilizar estos puntos, hay que disponer de una tarjeta RFID. El Ayuntamiento dispone de estas tarjetas para los usuarios.
eTecnic http://www.etecnic.es (+34) 977 276 952
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
CEE 7/4 - Schuko - Type F
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ascó-LAFON
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Central Nuclear de Ascó
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Flix - Joan Maragall
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Flix. Plaza Del Mercado
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
E.S. Bon Area Flix
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Flix
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest Pas De L'Ase
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Riba-roja d'Ebre
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. del Molar
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by etecnic_me on 2016-07-22