Abbazia di Montevegliocharging location
Si attiva con l'APP Lampinet http://www.lampionet.it/
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign InRating: 3 out of 5 [ General Comment , Charged Successfully ]Si riesce a caricare, ma non senza qualche difficoltà: http://www.forumelettrico.it/forum/colonnina-abbazia-di-monteveglio-valsamoggia-bo-t908.html
Comment by ForumElettrico.it 03/27/2017 09:42:47
Rating: 1 out of 5 [ General Comment , Failed to Charge (Equipment Not Operational) ]Non funzionano da più di un anno, nonostante numerosi solleciti al Comune. Maggiori info qui: http://www.forumelettrico.it/forum/colonnine-a-monteveglio-castello-di-serravalle-e-savigno-t876.html
Comment by ForumElettrico.it 03/18/2017 08:14:56
Other Charging Locations
There are 9 matching results
BECHARGE Municipio di Monteveglio
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Castello di Serravalle
2
4
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Carrefour Bazzano
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Duferco Carrefour Bazzano
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Atlante Mulino
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Bazzano
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Q8
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ressolar Cimitero monumentale di Savignano Alto
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Ego
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2017-03-27
Uploaded by ForumElettrico.it on 2017-03-27