Hera Porta Nordcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
HeraRicarica Pubblica https://heracomm.gruppohera.it/casa/mobilita-sostenibile/ricarica-pubblica 800.087.591
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]In poco più di 10 minuti a piedi si arriva in centro, passando per il sottopassaggio della stazione: attenzione che Google Maps non lo conosce. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-inrete-distribuzione-energia-22-kw-parcheggio-porta-nord-modena-mo-via-manfredo-fanti-37-t4403.html
https://www.forumelettrico.it/forum/colonnina-inrete-distribuzione-energia-22-kw-parcheggio-porta-nord-modena-mo-via-manfredo-fanti-37-t4403.html Comment by ForumElettrico.it 03/18/2023 11:28:37
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-inrete-distribuzione-energia-22-kw-parcheggio-porta-nord-modena-mo-via-manfredo-fanti-37-t4403.html Comment by ForumElettrico.it 12/23/2018 17:11:33
Other Charging Locations
There are 9 matching results
Duferco Casa della Salute
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Esselunga
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera PalaMadiba
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Stazione di Modena
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Best Western Premier Milano Palace Hotel
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
EnerMia
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Parco Vittime innocenti di Utoya
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-03-18
Uploaded by ForumElettrico.it on 2023-03-18
Uploaded by ForumElettrico.it on 2023-03-18
Uploaded by ForumElettrico.it on 2023-03-18
Uploaded by ForumElettrico.it on 2023-03-18
Uploaded by ForumElettrico.it on 2018-12-23
Uploaded by ForumElettrico.it on 2018-12-23
Uploaded by ForumElettrico.it on 2018-12-23
Uploaded by ForumElettrico.it on 2018-12-23