To edit, add comments or upload photos: Sign In
Posto Vila Flor - RJ Eletropostoscharging location
Nearest Address:
Estrada do Galeão, 12 - Cacuia, Rio de Janeiro - RJ, 21931-382
Rio de Janeiro
Brazil
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
-22.815959
Longitude:
-43.1871
OCM Ref: OCM-507983
Data Provider:
Easy Volt https://www.ezvolt.com.br
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
CC-0
Providers Ref:
01a04999-a713-7001-b720-9ea60b3927e5
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-873114
40 kW
DC
380 V
200 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Eletroposto Brasil
4.82 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
H+ Hotel Logístico
5.54 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rede ML Primeiro do Brasil - RJ Eletropostos
5.93 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Petrobras - Posto São Cristóvão
Campo de São Cristóvão, 362 - São Cristóvão, Rio de Janeiro - RJ, 20921-440
Rio de Janeiro
Brazil
View
6.16 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plaza Shopping Niterói
6.36 Miles
Public - Membership Required
Operational
Public - Membership Required
Operational
NetPark - Ventura Towers
6.45 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
NetPark - Ventura Towers
6.45 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Posto Cruzada Niterói - RJ Eletropostos
6.79 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Petrobras - Posto Bracarense
6.82 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In