To edit, add comments or upload photos: Sign In
EV24 Charging Stationcharging location
Nearest Address:
Podłęże 752
Podłęże
32-005
Poland
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
50.0145597
Longitude:
20.1573918
OCM Ref: OCM-507614
Network/Operator
EV24 https://ev24.cloud
Data Provider:
QRSOLVE sp. z o. o. http://ev24.cloud
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
CC0
Providers Ref:
IS8MELRPP6
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-872305
22.2 kW
AC (Three-Phase)
400 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
EV24 Charging Station
3.15 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Greenway Polska Hotel Soray Wieliczka
5.69 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Greenway Polska Hotel Soray Wieliczka
5.69 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
IBIS Hotel
6.71 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Vtechtuning.eu parking
2
7.36 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centralna - ZDMK
7.45 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
M1 - GO+EAuto
7.8 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Greenway Polska Podium Park Kraków
8.16 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Fideltronik Kraków
9.04 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In