To edit, add comments or upload photos: Sign In
ENECHANGE EV 充電スタンドcharging location
Nearest Address:
ひじり野南1条6丁目1−1
アルティモール東神楽
東神楽町
北海道上川郡
071-1523
Japan
Number Of Stations/Bays:
2
Usage:
Public
Usage Cost:
アプリ内クレカ決済(ビジター可)・eMPカード対応
Operational Status:
Operational
Latitude:
43.722891769592536
Longitude:
142.40820370416395
OCM Ref: OCM-505302
Network/Operator
EV ENECHANGE (JP) https://ev-charge-enechange.jp/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
Operational
1 Present
OCM-CN-866454
6 kW
AC (Single-Phase)
200 V
30 A
Type 1 (J1772)
Operational
1 Present
OCM-CN-866455
6 kW
AC (Single-Phase)
200 V
30 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
セブン-イレブン 旭川東光2条店
2.1 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
セブン-イレブン 旭川神楽岡5条店
2
2.29 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
ENEOS南6条通りSS
2.29 Miles
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
CHAdeMO
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
CHAdeMO
フレスポ旭川龍谷 / 大和リース(株)
2.59 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
ENECHANGE EV 充電スタンド
1
2.94 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ENEOS チャレンジ 旭川神楽SS/北海道エネルギー(株)
1
3.05 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
旭川日産自動車(株) 神楽店
3.56 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
イオンモール旭川駅前店
3.8 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
旭川 BMW/BMW Premium Selection 旭川
4.03 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO