To edit, add comments or upload photos: Sign In
P-Hus (PowerGo)charging location
Nearest Address:
Kæhlersvej 19, 4700 Næstved
Næstved
4700
Denmark
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
55.22783660888672
Longitude:
11.770271301269531
OCM Ref: OCM-500977
Network/Operator
PowerGo https://www.powergo.energy
Data Provider:
PowerGo https://www.powergo.nl/
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
CC0
Providers Ref:
60848
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856875
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856876
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856877
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856878
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856879
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856880
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856881
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856882
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856883
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856884
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856885
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856886
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856887
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856888
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856889
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856890
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856891
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856892
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-856893
12.7 kW
AC (Three-Phase)
230 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Plejeboligerne på Helgesvej (PowerGo)
0.1 Miles
Public - Membership Required
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Munkebocentret (PowerGo)
0.15 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Grønvej Parkeringshus AC (PowerGo)
0.3 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Sundhedscentret (PowerGo)
0.31 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Meny Næstved
0.35 Miles
Unknown
Level 3: High (Over 40kW)
CCS (Type 2)
Unknown
Level 3: High (Over 40kW)
CCS (Type 2)
Kornblomsten (PowerGo)
0.38 Miles
Public - Membership Required
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Kulturcenter (PowerGo)
0.41 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Kildesalen (PowerGo)
0.42 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Ved Stadion (PowerGo)
0.44 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In