To edit, add comments or upload photos: Sign In
PAGANESSI S.r.l. - Sistemi Elettricicharging location
Number Of Stations/Bays:
1
Usage:
Privately Owned - Notice Required
Usage Cost:
0,56€ / kWh
Operational Status:
Operational
Latitude:
45.81235543080345
Longitude:
9.856673141353951
OCM Ref: OCM-498492
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-849146
40 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
PAGANESSI S.R.L. Sistemi Elettrici
2
0 Miles
Privately Owned - Notice Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Privately Owned - Notice Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Gazzaniga Stazione | Ressolar
2
2
1.46 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Gazzaniga Manzoni | EnelX
1
1
1.79 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
U2 supermercato | EnelX
1
2.46 Miles
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cene 4 Novembre | EnelX
4
5
2.68 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio Di Cene | EnelX
3
3
2.72 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cene
3
3.44 Miles
(Unknown)
Not Operational
(Unknown)
Not Operational
Municipio di Bianzano
3.99 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Vall'Alta I Maggio | EnelX
1
2
4.25 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)