Skip to content
Charging location

Kwik Trip #414

OCM-492445 Operational Public
To edit, add comments or upload photos Sign in

Nearest Address

101 Schumann Dr NW
Stewartville
MN
55976
United States
608-793-6267

Summary

Number Of Stations/Bays
4
Usage
Public
Usage Cost
$0.45/kWh
Operational Status
Operational
Latitude
43.87755661737734
Longitude
-92.48978550822949
OCM Ref
OCM-492445

Network/Operator

Kwik Charge (Kwik Trip)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 1)

4 present
Operational
350 kW
1000 V
500 A
DC

Tesla (Model S/X)

4 present
Operational
350 kW
1000 V
500 A
DC

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

410 S Main St, Stewartville, MN, 55976, United States
1.8 Miles Public Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
7381 Airport View Dr SW, Rochester, MN, 55902, United States
2.63 Miles Public Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
4850 Maine Ave SE, Rochester, MN, 55904, United States
5.24 Miles Public Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
1188 50 St SE, Rochester, MN, 55904, United States
5.29 Miles Public Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
1188 50 St SE, Rochester, MN, 55904, United States
5.29 Miles Public Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
4353 Canal Pl SE, Rochester, MN, 55904, United States
5.87 Miles Public Operational Level 2 : Medium (Over 2kW) Tesla (Model S/X)
2828 US-52, Rochester, MN, 55901, United States
8.39 Miles Public Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
52 US-14, Rochester, MN, 55902, United States
8.71 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 1)
Upload your own photos for this location Sign In