To edit, add comments or upload photos: Sign In
Garage Parking (Xəqani Bağı)charging location
Nearest Address:
Üzeyir Həcibəyov küçəsi 6/8
Baku
Baku
Azerbaijan
+994512157899
General Information:
ELEKTRA AZ XƏQANİ BAĞI
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
0.30 AZN/kWh
Operational Status:
Operational
Latitude:
40.37097122239231
Longitude:
49.84093598039749
OCM Ref: OCM-491101
Access Information:
Inside the Garage Parking near Khagani Park - ex Molokanka
Network/Operator
E-lektra (AZ) https://e-lektra.az/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-831561
60 kW
DC
GB-T DC - GB/T 20234.3
Operational
1 Present
OCM-CN-831562
60 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Park Bulvar Mall
0.46 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hilton Hotel Baku
0.48 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Akademik Dram Teatrı
2
0.64 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Dalğa Plaza
1
0.97 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Dalğa Plaza
1
0.97 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Altes Plaza
1.06 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Time Business Center
1.1 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Intourist Hotel
1.21 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hilton Garden Inn
1.21 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In