To edit, add comments or upload photos: Sign In
JOB Centercharging location
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
45.94165485359573
Longitude:
15.488376238713634
OCM Ref: OCM-488183
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-823353
11 kW
AC (Three-Phase)
400 V
16 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
JOB CENTER
0.02 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Unknown
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Unknown
Krško Tesla Supercharger
1
1
0.51 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Cesta Krških Žrtev 51 (nasproti Pu Krško)
1.48 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cesta Krških Žrtev 31
1.63 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Avtohiša Radanovič Brežice
1
1
5.56 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
IONITY Smednik
6.12 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PETROL A2/E70 Grič
6.27 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Bozidar Jakac Art Museum
8.13 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Sistemi IN ES d.o.o.
10.52 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In