To edit, add comments or upload photos: Sign In
EcoOil Alabangcharging location
Nearest Address:
Commerce Avenue
Alabang
Muntinlupa City
Metro Manila
1783
Philippines
Number Of Stations/Bays:
3
Usage:
Public - Membership Required
Usage Cost:
DC: ₱35/kWh. AC: ₱28.50/kWh
Operational Status:
Operational
Latitude:
14.421078709179724
Longitude:
121.033658181737
OCM Ref: OCM-485437
Network/Operator
AC Mobility (PH) https://www.acmobility.ph/ +63 2 8403 3433
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-815243
40 kW
DC
GB-T DC - GB/T 20234.3
Operational
1 Present
OCM-CN-815244
40 kW
DC
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-815245
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Solarius EV Charging - Somerset Alabang
0.27 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
EVOxCharge Ford Alabang
0.28 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
BYD Alabang
0.3 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Alabang Town Center
0.31 Miles
Public - Membership Required
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Filinvest Central Park Parking Lot
0.36 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Bellevue Manila
0.45 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Solarius EV Charging - Crimson Hotel
Entrata Urban Complex, 2609 Civic Dr, Filinvest City
Alabang
Muntinlupa
Metro Manila
1781
Philippines
View
0.58 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Galaxy Charge - Padrino Celebration Pub
1.52 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
SM Souhtmall e-Vehicle Charging Station
1.66 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In