To edit, add comments or upload photos: Sign In
Jio-BP Mobility Stationcharging location
Nearest Address:
NH 48, 600, Bangalore - Pune Highway
near Milestone 645, Walwa
Sangli
Maharashtra
415403
India
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
23.99/kWh
Operational Status:
Operational
Latitude:
16.96074917540507
Longitude:
74.27238858371413
OCM Ref: OCM-484929
Network/Operator
JIO BP Pulse (India) https://www.jiobp.com/products-and-services/EV-charging
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-813590
30 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 6 matching results
Hotel 7/12 Food Mall
7.02 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Nakshatra Hotel
9.64 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Jio-BP Mobility Station
9.69 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
One Bite Restaurant & Captains Paradise Lodge
11.02 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Vijata Power Charging Station 60 kW
12.33 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Konduskar Kia
Plot No 6, Pune - Bengaluru Highway, near GNAT Industries
MIDC, Shiroli
Kolhapur
Maharashtra
416122
India
View
14.32 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In