To edit, add comments or upload photos: Sign In
ایستگاه شارژ پارس مبتکر فرتاکcharging location
Nearest Address:
بولوار چاپ و نشر
استان خراسان رضوی
91851-83794
Iran, Islamic Republic Of
Number Of Stations/Bays:
1
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
36.42919
Longitude:
59.40195
OCM Ref: OCM-478472
Network/Operator
مپنا - empana (IR) https://www.emapna.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
GB-T DC - GB/T 20234.3
Operational
1 Present
OCM-CN-803676
30 kW
DC
500 V
100 A
CCS (Type 2)
Operational
1 Present
OCM-CN-803677
30 kW
DC
500 V
100 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 5 matching results
ایستگاه شارژ نمایندگی ایرانخودرو زحمتکش کد3106
3.39 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ نبکا 2016 هادی زاده
5.8 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ عاکف
6.12 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ایستگاه شارژ پارکینگ پرستار
13.72 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ پارکینگ خسروی
14.9 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In