Edison Next Eni Battifollecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino ad almeno 131 kW e nell'area di servizio troviamo un bar pizzeria aperta tutti i giorno dalle 5:30 alle 20. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-edison-next-high-power-eni-arezzo-ar-ss-679-battifolle-t44991.html
https://www.forumelettrico.it/forum/colonnina-edison-next-high-power-eni-arezzo-ar-ss-679-battifolle-t44991.html Comment by ForumElettrico.it 01/18/2026 18:13:14
Other Charging Locations
There are 9 matching results
Arezzo Supercharger - aperto a veicoli NON TESLA
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Zero Spreco NRG1 - ZapGrid
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Conad Ponte A Chiani
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free To X ADS Badia al Pino Ovest
3
9
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Euronics San Zeno - ZapGrid
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ADS Badia al Pino Ovest
Public
Unknown
Level 1 : Low (Under 2kW)
CEE 3 Pin
Free To X AdS Badia al Pino Est
1
3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way New Cars
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SUPER A&O AREZZO Pisacane | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18