To edit, add comments or upload photos: Sign In
Islamic Commercial Centre, Boulevard, Miri (Gentari x SEB)charging location
Nearest Address:
AL-BAYT Square, Miri 1010 Commercial Centre
Jalan Miri Pujut
Miri
Sarawak
Malaysia
Number Of Stations/Bays:
1
Usage:
Public - Membership Required
Usage Cost:
RM 1.40/kWh
Operational Status:
Operational
Latitude:
4.4134461808019125
Longitude:
114.01134347608809
OCM Ref: OCM-473102
Network/Operator
Gentari Go (MY) https://www.gentari.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-794550
60 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-794551
180 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 7 matching results
Miri Green Community Hub
0.38 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
SEB Miri
0.69 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Miri Times Square
2.22 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Miri Multistorey Parking
2.22 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Starbucks Marina ParkCity DT
2.67 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Permy Mall Miri
3.09 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Miri City Hall
3.15 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In