To edit, add comments or upload photos: Sign In
Zirvə Hotelcharging location
General Information:
Zirve Hotel
Number Of Stations/Bays:
4
Usage:
Public - Membership Required
Usage Cost:
0.28 AZN/kWh
Operational Status:
Operational
Latitude:
41.321581334163255
Longitude:
48.149596434237424
OCM Ref: OCM-472213
Access Information:
Zirve Hotel
Network/Operator
iVolt (AZ) https://ivolt.az/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-792963
60 kW
DC
GB-T DC - GB/T 20234.3
Operational
1 Present
OCM-CN-792964
60 kW
DC
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-792965
7.4 kW
AC (Three-Phase)
GB-T AC - GB/T 20234.2 (Tethered Cable)
Operational
1 Present
OCM-CN-792966
7.4 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 6 matching results
Şahdağ Hotel & SPA
0.71 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Park Chalet (Shahdag)
0.75 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Tethered Cable)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Tethered Cable)
Pik Palace (Shahdag)
0.78 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Tethered Cable)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Tethered Cable)
Hill Park (Xutorok)
13.48 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hill Park Hotel
13.48 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Xıdır Restoran
14.44 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Upload your own photos for this location: Sign In