Plenitude Scuola Primaria Don Milanicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok sulla presa di destra e a soli 100 metri troviamo un bel risto bar ma siamo anche a pochi minuti a piedi dal centro storico, raggiungibile tramite un comodo porticato. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-plenitude-22-kw-scuola-primaria-don-milani-novellara-re-piazza-della-resistenza-t44538.html
https://www.forumelettrico.it/forum/colonnina-plenitude-22-kw-scuola-primaria-don-milani-novellara-re-piazza-della-resistenza-t44538.html Comment by ForumElettrico.it 12/03/2025 07:01:40
Other Charging Locations
There are 9 matching results
Municipio di Novellara | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Novellara Viale dello Sport | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Centro Commerciale
1
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Stazione di Novellara | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Cristoforo Colombo
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Parco Augusto Daolio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Vettigano
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Palazzetto dello Sport
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Golf Club Santo Stefano
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-12-03
Uploaded by ForumElettrico.it on 2025-12-03
Uploaded by ForumElettrico.it on 2025-12-03
Uploaded by ForumElettrico.it on 2025-12-03
Uploaded by ForumElettrico.it on 2025-12-03