Cartagena (Zunder)charging location
Station equipped with a boost battery. Max Power limited when charger battery is low of charge
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Zunder https://www.zunder.com/en/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
ABB Terra360 charger. The DC charger allows charging one vehicle at 360 kW, or two simultaneous charges at 180 kW. Nominal current 300A, max peak current 500A. Charging power limited to 200 kW for 400 V vehicles. Peak power can be reduced when the thermal control of the connector is activated.
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ayunt. El Algar
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Lavadero El Algar
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
Hotel Senator Mar Menor Golf & Spa Resort
1
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
La Serena Golf
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aparcamiento público Alcázares
Public
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. La Unión. Calle Tarquines
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mercadona La Unión
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. La Unión. Calle Mayor
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Torre-Pacheco. Pino Carrasco
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In