To edit, add comments or upload photos: Sign In
Safewaycharging location
Nearest Address:
4080 San Pablo Avenue
Hercules
CA
94547
United States
Number Of Stations/Bays:
10
Usage:
Public
Operational Status:
Operational
Latitude:
38.01504354412131
Longitude:
-122.27200675402798
OCM Ref: OCM-470312
Network/Operator
Electrify America https://www.electrifyamerica.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
Operational
10 Present
OCM-CN-789634
350 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
3600 San Pablo Ave
0.25 Miles
Private - Restricted Access
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 1)
Private - Restricted Access
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 1)
Save Mart-Lucky 718 (Hercules, CA)
0.51 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
PINOLE SFTY BLD CITY OF PINOLE
1.25 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Sprouts
1.32 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Sprouts
1.32 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Pinole Vista Shopping Center - Tesla Supercharger
2.33 Miles
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
HILLTOP HYUNDAI STATION 2
3.32 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Hilltop Ford Kia
3.36 Miles
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Site Centers Hilltop Plaza (Richmond, CA)
3.37 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In