To edit, add comments or upload photos: Sign In
Azərişıq EDM (AliBaba Premium Lounge)charging location
General Information:
Ali Baba Premium
Number Of Stations/Bays:
4
Usage:
Public - Membership Required
Usage Cost:
0.26 AZN
Operational Status:
Operational
Latitude:
40.37828424539845
Longitude:
49.8172280766164
OCM Ref: OCM-469352
Access Information:
Ali Baba Premium/Chaikend
Network/Operator
Azerishig VEP (AZ) https://www.azerishiq.az/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-787867
120 kW
DC
GB-T DC - GB/T 20234.3
Operational
2 Present
OCM-CN-787868
120 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Renessans Palace
1
0.4 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Murad Petrol
0.48 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
RICH YK
0.6 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Akademik Dram Teatrı
2
0.72 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Altes Plaza
0.74 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Hyatt Regency Hotel
0.79 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Qələbə Dairəsi (Azpetrol)
0.87 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Baku Mall (Qələbə Dairəsi)
2
0.96 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Idman Konsert Kompleksi
1
1.04 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In