MCLB Barstow / Phase B / Bldg 236charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
440058
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Unknown
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
BLAIRSVILLE BLAIRSVILLE COC
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
7SPC
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Best Western Milton Inn
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
BRMEMC STATION 2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Panel Built
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Young Harris College
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Brasstown Valley Resort and Spa
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Brasstown Valley Resort and Spa - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Holiday Inn Express & Suites Murphy, an IHG Hotel
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In