To edit, add comments or upload photos: Sign In
Adgar Tower Publiccharging location
Nearest Address:
35 Efal st
Petach Tikva
4951132
Israel
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
32.0982055
Longitude:
34.847932
OCM Ref: OCM-463030
Network/Operator
Greems (IL) https://www.greems.io/
Data Provider:
Greems Technologies http://www.greems.io
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
CC0
Providers Ref:
bd0433a8-ab76-418a-9bc9-dc41edc96014
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778974
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778975
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778976
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778977
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778978
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778979
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778980
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778981
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778982
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778983
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778984
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-778985
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778986
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778987
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778988
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778989
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778990
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-778991
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778992
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-778993
12.7 kW
AC (Three-Phase)
230 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Park Ofer East
0.4 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Pango Labs
0.87 Miles
Public - Membership Required
Planned For Future Date
Level 1 : Low (Under 2kW)
Type 2 (Socket Only)
Public - Membership Required
Planned For Future Date
Level 1 : Low (Under 2kW)
Type 2 (Socket Only)
Y Center פתח תקוה
1.02 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ofer Grand Mall Petach Tikva
1.1 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
פארק עתידים - (קרית עתידים) ת"א
1.16 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Basel 1
1.17 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger Petah Tikva
1.23 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(פרטי) 2285 - לוח 1
1.37 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
2964 - פרטי
1.39 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In