To edit, add comments or upload photos: Sign In
Baku Mall (Qələbə Dairəsi)charging location
General Information:
Baku Mall - Qələbə dairəsi
Number Of Stations/Bays:
8
Usage:
Public - Membership Required
Usage Cost:
0.30 AZN/kWh
Operational Status:
Operational
Latitude:
40.38977742351912
Longitude:
49.80700530010972
OCM Ref: OCM-462352
Access Information:
Baku Mall - Qələbə dairəsi
Network/Operator
TOK (AZ) https://tok.az/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-777669
60 kW
DC
GB-T DC - GB/T 20234.3
Operational
3 Present
OCM-CN-777670
60 kW
DC
CCS (Type 2)
Operational
1 Present
OCM-CN-825611
120 kW
DC
GB-T DC - GB/T 20234.3
Operational
3 Present
OCM-CN-825612
120 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Qələbə Dairəsi (Azpetrol)
0.09 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Renessans Palace
1
0.56 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Grand Hayat Residence
0.6 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
RICH YK
0.69 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Qafqaz Baku City Hotel & Residences
0.74 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Rahat Supermarket
1
0.79 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Murad Petrol
0.8 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bravo Hipermarket (20 Yanvar)
1
0.82 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bravo Hipermarket (20 Yanvar)
0.86 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3