To edit, add comments or upload photos: Sign In
Hotel Campestre Lagos De Venecia charging location
Nearest Address:
Calle 37 Via Guacas
Santa Rosa De Cabal
Risaralda
661020
Colombia
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public
Usage Cost:
25000
Operational Status:
Operational
Latitude:
4.8895915099793115
Longitude:
-75.62269716386982
OCM Ref: OCM-461670
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
NEMA 6-15
Operational
2 Present
OCM-CN-776639
3.5 kW
AC (Single-Phase)
220 V
16 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 6 matching results
Tambo El Privelegio
2.54 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
CDA VILLA
6.4 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Centro Comercial Pereira Plaza
7.38 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Electrolinera Energía de Pereira
9.86 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Tambo La Manuela
11.76 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Cerritos del Mar
14.76 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In