To edit, add comments or upload photos: Sign In
Petrobras - Posto Líder 1charging location
Nearest Address:
Posto Líder - Av. ⅩⅤ de Novembro, 563 - Caju, Campos dos Goytacazes - RJ, Brasil
Campos dos Goytacazes
Brazil
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
-21.743383
Longitude:
-41.33485
OCM Ref: OCM-459128
Data Provider:
Easy Volt https://www.ezvolt.com.br
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
CC-0
Providers Ref:
2666e218-e791-4195-bdb5-359d7b990921
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-771778
30 kW
DC
380 V
200 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 5 matching results
Shopping Guarus Plaza - Rede Volvo Eletropostos 60/30/23 kW
Av. Sen. José Carlos Pereira Pinto, 442/590 - Parque Calabouco, Campos dos Goytacazes - RJ, 28083-102
Campos Dos Goytacazes
RJ
Brazil
View
1.48 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PADARIA PONTUAL
1.98 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Posto Grafitti
3.13 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bazar Do Fundao - 02xCCS2 60kW Tupi
Av. Sen. Tarcisio Miranda, 555 - Parque Tarcisio Miranda, Campos dos Goytacazes - RJ, 28020-801
Campos Dos Goytacazes
RJ
Brazil
View
3.64 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Condomínio Alphaville
5.95 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In