Kwik Trip #247charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
65049
Data Quality Report
Data Quality Score: 60 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
NEMA 5-20R
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Woodgate Properties
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Woodgate Apartments
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Kwik Trip #234
Public
Level 1 : Low (Under 2kW)
NEMA 5-20R
Black Bear Casino Resort
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Korner Store
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Kwik Trip #273
Public
Level 1 : Low (Under 2kW)
NEMA 5-20R
Kwik Trip #220
Public
Level 1 : Low (Under 2kW)
NEMA 5-20R
Kwik Trip #216
Public
Level 1 : Low (Under 2kW)
NEMA 5-20R
Federal Prison Camp - Duluth
Private - Restricted Access
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In