BC Hydro - Goldencharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
BC Hydro https://ev.bchydro.com
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
259738
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
9th Avenue South
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Golden Home Hardware and Bldg Supplies
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Golden Village Lodge - Electricy Canada
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
On the Run EV Fast Charge
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Golden Fas Gas Plus - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Ponderosa Motor Inn
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Golden Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Holiday Inn Express
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Subway - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Upload your own photos for this location: Sign In