Casey's #3538 - Le Roycharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
EV Energy Group (FCN) https://evenergygroup.com/e
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
330023
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
VIKING CHARGE 1 CHARGE 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CBEC CENTRAL
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Central Illinois Regional Airport
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Parke Regency Hotel & Conference Center
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Barker Motor Co
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
O'Brien Nissan
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
LEMANCHEVY CITY SW LEVEL 3
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Westminster Village
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Doubletree By Hilton Hotel Bloomington
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Upload your own photos for this location: Sign In