Strickland Parkcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
EV Energy Group (FCN) https://evenergygroup.com/e
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
156525
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Strickland Park - Francis Energy
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Home2 Suites Stillwater
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Home2 Suites Stillwater - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Stillwater Library
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
South Duncan Street
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
OK Boomer Lake Memorial Parking East - Francis Energy
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Boomer Lake East - Stillwater
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Boomer Lake West - Stillwater
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
OK Boomer Lake Memorial Parking West - Francis Energy
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In