California State University - Channel Islandscharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily; permit required or day pass available for purchase
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
64416
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
California State University - Channel Islands
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
California State University Channel Islands
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
California State University - Channel Islands
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ANDORRA CPF25 STATION 8
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ANDORRA CPF25 SPACE 1 & 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ANDORRA CT4000
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ANDORRA CPF25 STATION 6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Camarillo Corp Yard 1-20
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Camarillo Metrolink Station
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In