EV BUS YARD GW2charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
ChargePoint http://www.chargepoint.net/ 1-408-841-4500
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
397562
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Tara Crossing
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
GEORGIA POWER RIVERDALE DC 2
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
SIMAYN ENERGY JONESBORO DC2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
MB - Shops at Tara - Jonesboro, GA
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Ionna - Forest Park, GA
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Morrow, GA Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
GEORGIA POWER JONESBORO DC2
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Riverdale Crossing
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
THUNDER TOWER 1 DCFAST HOG
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In