Bexar County Parking Garagecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
333569
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
New United States Courthouse
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Riverwalk Plaza Hotel
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
CSA CITY HALL CITY HALL ST1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Market Street Garage
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Market Street Garage
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Agave
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Agave
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SAN ANTONIO SA.B001.S1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CPSE-SATX UTSA DURANGO 01
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In