Acea Veggiacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Acea (IT) https://www.acea.it/e-mobility
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino a 52 kW ed in 3 minuti a piedi andando verso il centro troviamo subito due bar, di cui uno aperto anche la domenica. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-acea-fast-casalgrande-re-via-ferdinando-magellano-10-veggia-t42541.html
https://www.forumelettrico.it/forum/colonnina-acea-fast-casalgrande-re-via-ferdinando-magellano-10-veggia-t42541.html Comment by ForumElettrico.it 06/08/2025 16:47:37
Other Charging Locations
There are 9 matching results
Emobitaly MD Casalgrande
3
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SASSUOLO Parcheggio Legnago | ENELX
2
6
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Acea Sant'Antonino
2
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Palazzo Ducale
3
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SASSUOLO Alessandrini | ENELX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Stazione di Sassuolo Terminal | EnelX
3
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eni
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
A2A Tigotà
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-06-08
Uploaded by ForumElettrico.it on 2025-06-08
Uploaded by ForumElettrico.it on 2025-06-08
Uploaded by ForumElettrico.it on 2025-06-08
Uploaded by ForumElettrico.it on 2025-06-08