Ewiva Nonna Isacharging location

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 2
Usage: Public
Operational Status: Operational
Latitude: 39.931729
Longitude: 9.65819
OCM Ref: OCM-312614
Network/Operator

Ewiva (IT) https://ewiva.com/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

CCS (Type 2)

Status Unknown
4 Present
OCM-CN-602306
150 kW DC

Add your own comment/check-in for this location:

Sign In
[ General Comment , Charged Successfully ]

Tutto ok fino a 140 kW e sono situate nel parcheggio del supermercato che è aperto tutti i giorni tranne la domenica pomeriggio. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-ewiva-high-power-nonna-isa-tortoli-nu-via-sergio-atzeni-26-t42234.html

https://www.forumelettrico.it/forum/colonnine-ewiva-high-power-nonna-isa-tortoli-nu-via-sergio-atzeni-26-t42234.html Comment by ForumElettrico.it 05/13/2025 15:04:21

Other Charging Locations

There are 6 matching results

Via Cedrino
 

Via Cedrino
Tortolì
Sardinia
08048
Italy
View
0.47 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Enel X Way Tortolì
1   5

Via della Lavandaia
Tortolì
Sardinia
08048
Italy
View
0.53 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Hotel Club Saraceno
 

Loc. San Gemiliano
Arbatax
Nuoro
08048
Italy
View
2.39 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Enel X Way Bari Sardo
1   5

Piazza Mercato
Barì/Bari Sardo
Sardinia
08042
Italy
View
6.17 Miles
Public - Membership Required
Temporarily Unavailable
Level 3: High (Over 40kW)
CCS (Type 2)

Ewiva Q8
1   5

SS 198 km 4
Loceri
NU
Italy
View
7 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Camping Villaggio L' Ultima Spiaggia
 

Località Planargia SNC
Strada Comunale Sa Marina
Bari Sardo
OG
08042
Italy
View
7.87 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In

Uploaded by ForumElettrico.it on 2025-05-13

Uploaded by ForumElettrico.it on 2025-05-13

Uploaded by ForumElettrico.it on 2025-05-13

Uploaded by ForumElettrico.it on 2025-05-13

Uploaded by ForumElettrico.it on 2025-05-13