To edit, add comments or upload photos: Sign In
Estacion BYDcharging location
Nearest Address:
Avenida Aviador Silvio Pettirossi
Luque
Central
001509
Paraguay
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
3
Usage:
Public
Usage Cost:
0
Operational Status:
Operational
Latitude:
-25.26241876044203
Longitude:
-57.527373722586276
OCM Ref: OCM-307521
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
GB-T AC - GB/T 20234.2 (Socket)
Operational
3 Present
OCM-CN-586608
7 kW
AC (Single-Phase)
220 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Biggie - Luque - EverGo
0.84 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Avenida Santa Teresa
2.68 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Shell Recharge | Estación Shell Bahia Aviadores - ASU
2
3.2 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Biggie - Genaro Romero - EverGo
3.25 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Estación Integral - Sacramento
3.36 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Volvo Rieder - EverGo
3.43 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Paseo Carmelitas
3.52 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Biggie Mcal. Lopez - EverGo
3.59 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Biggie - Lillo Villa Morra
3.69 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In