IrenGo Palahockey San Paolo Tribunalecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]A pochi metri da due quick di altro gestore ed a pochi minuti a piedi da diversi bar, ristoranti e servizi di vario tipo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-irengo-22-kw-palahockey-reggio-emilia-re-via-cisalpina-19-san-paolo-tribunale-t40118.html
https://www.forumelettrico.it/forum/colonnina-irengo-22-kw-palahockey-reggio-emilia-re-via-cisalpina-19-san-paolo-tribunale-t40118.html Comment by ForumElettrico.it 11/29/2024 15:07:26
Other Charging Locations
There are 9 matching results
Electra Roadhouse
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Neste Lataus Kerava
Public
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
The Tamrak
1
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Powerşarj - Zirve Turistik Dinlenme Tesisi
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enerhub Enercoop
1
5
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
POWERŞARJ - Doğuş Dijital Enerji Elite Hotel Darıca
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
POWERŞARJ - Doğuş Dijital Enerji Köz Kanat Ataşehir
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
POWERŞARJ - Iyaşpark Otel
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Staglieno
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-11-29
Uploaded by ForumElettrico.it on 2024-11-29
Uploaded by ForumElettrico.it on 2024-11-29
Uploaded by ForumElettrico.it on 2024-11-29
Uploaded by ForumElettrico.it on 2024-11-29