To edit, add comments or upload photos: Sign In
Metronortecharging location
Nearest Address:
Max Colin 1701
Joinville
Santa Catarina
89201215
Brazil
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
1,70
Operational Status:
Operational
Latitude:
-26.294601266589737
Longitude:
-48.85937348014434
OCM Ref: OCM-303432
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-571931
60 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 4 matching results
Solturi Energia
1.05 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eletroposto Celesc GutBrau
1.49 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Centro Turístico e Comercial da Expoville
1.49 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Posto Rudnick
R. Quinze de Outubro, 365 - Rio Bonito (Piraberaba), Joinville - SC, 89239, Brazil
Joinville
Santa Catarina
89239000
Brazil
View
8.21 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In