To edit, add comments or upload photos: Sign In
E.S. DISA Valverdecharging location
Nearest Address:
Calle de La Constitución
Valverde
38900
Spain
Number Of Stations/Bays:
2
Usage:
Public - Pay At Location
Usage Cost:
0,62€/kWh
Operational Status:
Operational
Latitude:
27.812069842059316
Longitude:
-17.914363539234728
OCM Ref: OCM-302141
Network/Operator
PRIOE http://www.prioenergy.com/produtos-e-servicos/mobilidade-electrica/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-566055
60 kW
DC
900 V
150 A
HelloNext H2-60 Charger. The DC charger allows charging one vehicle at 60kW, or two simultaneous charges at 30kW.
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Valverde - El Hierro
1
0.28 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Valverde - Calle San Francisco
0.42 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Puerto de La Estaca
2.03 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Gorona El Viento Central Eléctrica
1
2.51 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cooperativa Campo de Frontera
1
6.45 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Parador de El Hierro
7.11 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Frontera
1
7.3 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SuperDino Frontera
1
7.38 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aibique
1
8.53 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)